Stage at the First President of Kazakhstan Fund — DIVIO raised access floor system with parquet-style finish

Administrative buildings · Almaty · Supply only

Stage Raised Floor — First President's Fund, Almaty

← All projects

Supply of a raised access floor system made of calcium sulfate panels with PVC finish imitating natural parquet for the stage at the First President of Kazakhstan Fund. Client — Azimut LLP.

Updated

Client
Azimut LLP
City
Almaty
Object type
Administrative buildings
Scope of work
Supply only
Year
2020

About the Project

Supply of a raised access floor system for the stage at the First President of the Republic of Kazakhstan Fund in Almaty. Client — Azimut LLP. Facility type — administrative building.

Solution

The raised access floor system is built from non-combustible calcium sulfate panels with a PVC finish imitating natural parquet. This solution provides the required load capacity and fire safety for the stage while preserving the visual effect of parquet flooring in the interior.

The pedestals and support elements were delivered by a partner contractor on its own structural system, while DIVIO supplied the finish panels.

DIVIO Scope

  • Supply of calcium sulfate raised floor panels
  • Supply of PVC finish with natural parquet imitation
  • Associated raised access floor hardware and fasteners
  • Logistics and site delivery

Structural installation was performed by the partner contractor. Engineering works (cable runs, electrical) were not within DIVIO's scope on this facility.

04Project photos

Stage Raised Floor — First President's Fund, Almaty

Stage Raised Floor — First President's Fund, Almaty — photo 3
Stage Raised Floor — First President's Fund, Almaty — photo 4
Stage Raised Floor — First President's Fund, Almaty — photo 5
Stage Raised Floor — First President's Fund, Almaty — photo 6

Have a similar project?

Tell us about your project — we'll propose a solution and estimate the timeline.