Object
The Transtelecom telecommunications center in Astana. The client of DIVIO was the system integrator Genesis Engineering. DIVIO supplied the raised floor system and installed it across 338 m². Year — 2020.

Scope
Area — 338 m², finished floor height — 450 mm.
The panel covering is 3 mm antistatic rubber — a special solution for the requirements of the site. The panels were supplied with this covering already applied.

Raised floor area in the telecommunications center.
Finished floor height.
Antistatic rubber on top of a calcium sulphate panel — a special solution for the requirements of the site.
Structure
The panel is high-density calcium sulphate, 1600 kg/m³, 30 mm thick, with 3 mm antistatic rubber on top. The galvanized steel substructure was assembled with reinforced stringers and fixed to the subfloor.
The schematic below shows a section with the floor height and stringers, the panel build-up, and the area in 600 × 600 mm modules.
Floor section
- 1Panel 600 × 600 mm
- 2Stringer
- 3Pedestal
- 4Subfloor
- Floor height — 450 mm
Panel · 600 × 600 mm
- 01Antistatic rubber, 3 mm
- 02Calcium sulphate 1600 kg/m³, 30 mm
Area in 600 × 600 mm modules
338 m²
- 600 × 600 mm module
A standalone service
Raised access floor engineering
Load calculations, structure and core selection, the layout grid, specifications and drawings. Available without installation.
Works
The work went in order: priming the concrete subfloor, assembling the substructure with reinforced stringers and fixing it to the subfloor, laying the panels. DIVIO also supplied the system.
- Site
- Transtelecom telecommunications center, Astana
- Client of DIVIO
- System integrator GENESIS Engineering Project Management
- Area
- 338 m²
- Floor height
- 450 mm
- Panel
- 600 × 600 mm, calcium sulphate 1600 kg/m³, 30 mm
- Covering
- Antistatic rubber, 3 mm
- Substructure
- Galvanized steel, reinforced stringers, fixed to the subfloor
- Subfloor
- Concrete priming
- Year
- 2020
- DIVIO role
- Supply and installation
Gallery
Updated
More projects
Data centers & server rooms
Your next site
Need a raised floor for a server room?
Tell us the area, height and equipment loads — we'll select the system class and work out the specification.