About the Project
An additional server room facility for KarTel LLP (Beeline) in Astana. Supply and installation of a Falshpoly raised access floor system with preparation for cable infrastructure deployment.
Scope of Work
- Raised access floor system installation
- Cable routing preparation
- Patch cable layout
- Coordination with the client's engineering team


